01 · Tank Removal

Vacuum & Hydro-Vac Service

We have Vacuum and Hydro-Vac trucks to power wash and clean tanks, and Petroleum Mechanic (PM) qualified employees to remove underground and aboveground tanks.

02 · Soil Remediation

Contaminated Soil Handling

Clarkway Construction has excavators and trained, experienced supervisors, operators, and lead hands required to excavate and handle contaminated soil.

03 · Groundwater Remediation

Certified Water Treatment

Our certificate of approval enables us to mobilize our water treatment system for treatment and discharge of large volumes of impacted water on-site.

04 · Site Restoration

Winter-Ready Backfill

Our certificate of approval for our ALLU buckets allows us to crush and screen frozen material otherwise suitable for backfill — allowing us to work uninterrupted through the winter months.

By The Numbers

Remediation On Record

Figures drawn from Clarkway's published project case studies — see the Projects page for full detail.

1.4M L

Groundwater treated

Cambridge, ON · 2011–2012 project.

2.2M L

Groundwater treated

Trenton, ON · 2009 project.

6,000 T

Soil managed

Trenton, ON · 2009 project (est.).

Photos

Field Documentation

Authentic remediation photography could not be retrieved through available tooling and has not been fabricated. These four slots (environment_01–04) are ready for the client's real photography.
Clarkway environment photo environment_01.jpg
environment_01.jpg
Clarkway environment photo environment_02.jpg
environment_02.jpg
Clarkway environment photo environment_03.jpg
environment_03.jpg
Clarkway environment photo environment_04.jpg
environment_04.jpg

Contaminated site? We're licensed to handle it.

MOE licensed for soil haulage and contaminated water transport.